Last Updated: February 5, 2024

PROJECT TYPE:

Street Improvements

PROJECT VALUE:

$1,575,000

PROJECT SCHEDULE:

Bid Opening: TBD
Construction: Spring/Summer thru Fall 2024


CONTACT INFORMATION:

Andi Zontek-Backstrum, PE
Deputy Public Works Director
Email: [email protected]
Phone: (509) 548-5275 ext. 134

OTHER INFORMATION:

To learn more about the scrub seal pavement treatment process, visit https://www.youtube.com/watch?v=m50z5F_vF4c.

 

Print Friendly, PDF & Email

The 2024 Scrub Seal Project, is a significant initiative aimed at preserving our City’s roadways. The scrub seal method involves applying an asphalt emulsion and crushed rock to the roadway. This cost-effective method of pavement preservation fills existing roadway cracks and provides protection to the existing roadway surfacing. The project is part of our ongoing commitment to maintaining and improving the City’s infrastructure.

  • Project Highlights:
    • It is anticipated that some sections of the scrub seal will fail. TIB is testing the limits of this treatment in some locations in Leavenworth’s roadway network system.
    • Application of the scrub seal is a “catch up” method which will be followed with implementation of a pavement preservation program.
    • This scrub seal treatment will not improve the “ride” of the road.
    • Overall, design life for a scrub seal treatment is ~5-8 years.

This project is 90% funded by the Washington State Transportation Improvement Board (TIB). We are currently in the design phase and scrub seal efforts are expected to be completed by fall 2024.

Frequently Asked Questions:

 

I am a resident. How will this project impact me?
The impact to residents includes no on-street parking on multiple days to complete the work (e.g., scrub seal, fog seal, striping).

 